PMP 20007 Project Management Concepts

Academic Anxiety?

Get an original paper within hours and nail the task

156 experts online

Free Samples

PMP 20007 Project Management Concepts

.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}

PMP 20007 Project Management Concepts

0 Download8 Pages / 1,775 Words

Course Code: PPMP20007
University: Central Queensland University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Question:
Discuss about the Project Management Concepts.
 
 
Answer:

Project Description
The project has been made for developing the webpage and system development process. The development of the web page and web system has been formed in a project format for increasing the functionality of the operation included. The system development has been helpful for dealing with the issues of project operations. The webpage development consists of various operations like collection of data, requirement analysis, coding for the webpage, and deployment of the system.
Status summary
Summary:
The project has completed the operations of web design, database design, development of design, interface design, final design, testing, and training in the estimated time. Hence it is probable that the project would be completed in the stipulated time.
The PV of the project is $34,760.00, the EV of the project is $13,573.33, and the  SV of the project is $21,186.67. Hence the remaining project worth is equal to the difference between BAC-EAC and it is equal to $3237.60.
Budget
The actual cost to date:      $105,520.00
The planned cost to date:   $115,840.00
Summary:
The project has been doing perfectly well and all the operations of the project are within the budget. The operations of the project have resulted in implying the cost effective and efficient operations of the organization. The project has helped in deciding the web page development requirements and justification of the costs indulged in the project. The operations of the project include the designing of the web page that has been scheduled and completed in 34 days with an expenditure cost of $19,880.00. The software designer, business analyst, project manager, and software engineer are the persons included in the project. The data base design has been made in 5 days with cost estimate of $4,240. The interface designing has been helpful for supporting the creation of interface of the system and webpage that has been completed in 24 days for an expense of $10,080.00. It took 32 days for completing the development phase of webpage and the total cost expended was about $25,760.00. The testing and training for the webpage developed was done in 51 days and a sum of $35,800.00 was expended in the process. The launch has been scheduled to be performed next.
 
The overall expenses include the operations that have been completed such as designing of the web page, data base design, interface designing, development phase, testing, and training. The individual costs and expenses have summed up to $ 95760.00 and it is the expected costs that would be summed up to be around $115,840.00 AUD.
Explanations
The complete project of website development consists of web design, database design, interface design, final design, development, testing, training, launching, and closure phases. These phases contain a set of operations that would help in the successful completion of the project of webpage development. The phases that have been completed till 18th of July, 2017 are web design, interface design, database design, final design, development, testing, and training. The first phase designing of webpage consists of creating user interface mock-ups, conducting design review, delivering functional specifications, functional design specifications approval, developing technical specification, review of technical specifications, and technical design specifications approval. The second phase of database designing consists of developing database specifications, review of database specifications, and database specifications approval. The interface designing consists of determining of data import/export elements, defining user needs, and defining IT needs. The fourth phase of final design consist of collecting user requirements, designing reports, review of report design, and delivering final functional specifications. The development phase consists of coding web page, identification of database relation, and building the tables of database. The testing phase consists of the process to verify design and functionality, perform integration test, perform user acceptance test, and system user interface bug fixation. The training phase consists of assembling specifications, developing system flowcharts, completing the system documentation, and assembling functional specifications. All of these tasks have been completed in stipulated time and with exhaustion of allocated resources. The successful completion of project would require the completion of the phase in time allocated. The completion of the project would be based on the completion of the remaining phases of the project and they are launching of the website, closure report, and post reviews.
 
Major changes or issues since last report
The last report of the project was submitted in the initial phase after analysing the requirements and objectives. In that report only the initial requirements were analysed and it included creating a plan for completion of the project. The cost distribution of the project operations are shown in the figure below:
 
Figure1: Cost allocation for each phase of the project
The graph has shown that the operations of the project have been allocated with sufficient resources for each of the operations included in the project. The allocated resources have been helpful for providing the benefit of the system development and configuration. The variation in baseline has shown that the project resources would be helpful for complying with the development of the project operations. The changes that the project had undergone since the last report includes:
Creation of web design: The first phase has been completed and the design processes for the webpage has been made. It has comply the completion of creating user interface mock-ups, conducting design review, delivering functional specifications, functional design specifications approval, developing technical specification, review of technical specifications, and technical design specifications approval. The software designer and engineer have been helpful for completion of the web design.
 
Making Database Design: The database design is the phase in which the design of the database is completed and made ready to implementation. The processes included in the database design phase are developing database specifications, review of database specifications, and database specifications approval. The completion of all these steps had helped in yielding proper design for the database structure.
Creation of the Interface design: The interface design phase consists of making the UX interface design for the webpage. The process consist of creating an interface design along with determining of data import/export elements, defining user needs, and defining IT needs. The completion of the processes had yielded in making a systematic design for the interface of the webpage.
Final Design creation: The creation of final design has yielded in forming the final webpage design. The processes included in the project are collecting user requirements, designing reports, review of report design, and delivering final functional specifications. It would help in forming the final design creation of the webpage developed.
Development of the webpage: It is the final step of technical operations and completion of this phase would result in final development of the webpage. The processes included in the phase are coding web page, identification of database relation, and building the tables of database.
Webpage testing and training: The testing phase results in testing the webpage for any error and flaw. The testing phase consists of the process to verify design and functionality, perform integration test, perform user acceptance test, and system user interface bug fixation. The training phase consists of assembling specifications, developing system flowcharts, completing the system documentation, and assembling functional specifications.
 
Risk watch:
Risk watch in project can be done by implementing risk assessment process (McNeil, Frey and Embrechts 2015). The risk assessment consist of processes like risk mitigation, risk prioritization, and documentation for dealing with the risk and threats of the project.
Risk mitigation process: The risk mitigation addresses the procedure behind hazard administration and the hazard appraisal meeting permits the venture group to distinguish, classify, organize, and relieve or keep away from these dangers early. Chance evaluation is a stage in a hazard administration strategy (Li 2014). Hazard evaluation is the assurance of quantitative or subjective estimation of hazard identified with a solid circumstance and a perceived risk. Hazard evaluation includes measuring the likelihood that a hazard will turn into a reality.
Risk prioritization: In many ventures, dangers are recognized and broke down in an arbitrary, conceptualizing, design (Lim et al. 2013). This is frequently lethal to the accomplishment of the venture, as unforeseen dangers emerge, which have not been evaluated or gotten ready for and must be managed on a crisis premise, instead of be set up for and shielded against in an arranged, measured, way. It is fundamental that potential dangers are recognized, sorted, assessed and reported. As opposed to take a gander at every hazard freely and haphazardly, it is substantially more compelling to recognize dangers and after that gathering them into classifications, or, to draw up a rundown of classifications and afterward to distinguish potential dangers inside every classification.
Documentation process: The Project Manager will enter every one of the dangers, likelihood affect scores, and reactions and keep up an archive to clarify all danger (Hopkin, 2017). The high scoring dangers will be added to the Project Management Plan. This record will likewise be incorporated as an addendum to the Project Management Plan. Moreover, the dangers with a high score will be added to the venture plan as a strategy to track the hazard at the right time. Despite the fact that these dangers are added to the calendar, the timetable itself is not really changed. This progression is to give mindfulness and deceivability to the members of all high scoring dangers all through the venture’s lifecycle.
 
Bibliography
Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Burke, R., 2013. Project management: planning and control techniques. New Jersey, USA.
Schwalbe, K., 2015. Information technology project management. Cengage Learning
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Leach, L.P., 2014. Critical chain project management. Artech House.
Boud, D., Cohen, R. and Sampson, J. eds., 2014. Peer learning in higher education: Learning from and with each other. Routledge.
Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2013. Project management in practice. Wiley Global Education.
McNeil, A.J., Frey, R. and Embrechts, P., 2015. Quantitative risk management: Concepts, techniques and tools. Princeton university press.
Hopkin, P., 2017. Fundamentals of risk management: understanding, evaluating and implementing effective risk management. Kogan Page Publishers.
Lim, S.S., Vos, T., Flaxman, A.D., Danaei, G., Shibuya, K., Adair-Rohani, H., AlMazroa, M.A., Amann, M., Anderson, H.R., Andrews, K.G. and Aryee, M., 2013. A comparative risk assessment of burden of disease and injury attributable to 67 risk factors and risk factor clusters in 21 regions, 1990–2010: a systematic analysis for the Global Burden of Disease Study 2010. The lancet, 380(9859), pp.2224-2260.
Li, W., 2014. Risk assessment of power systems: models, methods, and applications. John Wiley & Sons.

Free Membership to World’s Largest Sample Bank

To View this & another 50000+ free samples. Please put
your valid email id.

E-mail

Yes, alert me for offers and important updates

Submit 

Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

UploadUnique Document

DocumentUnder Evaluation

Get Moneyinto Your Wallet

Total 8 pages

PAY 5 USD TO DOWNLOAD

*The content must not be available online or in our existing Database to qualify as
unique.

Cite This Work
To export a reference to this article please select a referencing stye below:

APA
MLA
Harvard
OSCOLA
Vancouver

My Assignment Help. (2018). PMP 20007 Project Management Concepts. Retrieved from https://myassignmenthelp.com/free-samples/project-management-concepts.

“PMP 20007 Project Management Concepts.” My Assignment Help, 2018, https://myassignmenthelp.com/free-samples/project-management-concepts.

My Assignment Help (2018) PMP 20007 Project Management Concepts [Online]. Available from: https://myassignmenthelp.com/free-samples/project-management-concepts[Accessed 19 December 2021].

My Assignment Help. ‘PMP 20007 Project Management Concepts’ (My Assignment Help, 2018) accessed 19 December 2021.

My Assignment Help. PMP 20007 Project Management Concepts [Internet]. My Assignment Help. 2018 [cited 19 December 2021]. Available from: https://myassignmenthelp.com/free-samples/project-management-concepts.

×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}

×

Thank you for your interest
The respective sample has been mail to your register email id

×

CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.

Account created successfully!
We have sent login details on your registered email.

User:

Password:

MyAssignmenthelp.com has appointed best assignment experts who are wizards of words. Our writers know every trick of crafting high quality write-ups within a short period. With years of experiences, we have become one of the most prolific assignment help services in the USA. We deliver custom-made help to students with writing different types of assignments. We guarantee total need-based and timely service, and this is why increasing numbers of students prefer to buy assignment online.

Latest Project Management Samples

div#loaddata .card img {max-width: 100%;
}

SBM 1201 Project Scope, Time And Cost Management
Download :
0 | Pages :
12

Course Code: SBM1201
University: Asia Pacific International College

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
This project plan deals with the development of a fuel-efficient HHO Generator. The HHO fuel cells may appear to provide high fuel efficiency to the users. Nevertheless, there are a few confinements and focuses to be seen, as given beneath. This is to clear up that there is NO 100% substitution of petroleum derivative by including HHO cell. HHO gas is otherwise called Brown Gas, yet this is to illuminate that HHO gas is n…
Read
More
Tags:
Australia Footscray Management organisational behviour University of New South Wales Masters in Business Administration 

HS2061 Information Systems Project Management
Download :
0 | Pages :
9

Course Code: HS2061
University: Holmes Institute

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Case Overview:
The project owner of the Signed, sealed, delivered courier service is facing the problems of managing order of couriers in the synchronised manner. The project manager is incapable of managing central warehouse for the dispatching of products. The important information can be lost with the passage of time. The inventory management of the warehouse is the major concern for the owner of the company. He is looking forward …
Read
More

OPS 935 Project Management
Download :
0 | Pages :
11

Course Code: OPS935
University: University Of Wollongong

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
This essay explores the impacts of digital technologies on project management. It explores how adoption of digital technologies by companies for managing their project have affected their, project managers, human resource, business processes, timelines, deliverables, and practices  of risk management, people management and quality management.
Impact of Digital technologies on Project Management Practices
Digital te…
Read
More
Tags:
Australia Saint Kilda Management International Management University of New South Wales Masters in Business Administration 

ITC505 ICT Project Management
Download :
0 | Pages :
10

Course Code: ITC505
University: Charles Sturt University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers
Case Study- Social Media Research Center
Task-1: Project Charter
Project Objectives
The main objective of the project is to develop a web-based system within the organization “Social Media research Center”. It is analyzed that the Social Media research center wants to develop the web based system in order to connect people with the organization for promoting its research center. The web-based system that is developed conta…
Read
More
Tags:
Australia Alfredton Management IT Network Security  University of New South Wales Masters in Business Administration 

ITC505 ICT Project Management
Download :
0 | Pages :
7

Course Code: ITC505
University: Charles Sturt University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers
Part One- Project Name / Team / Description
Project Name:
RALS Solution
Team Name:
Consultants for RALS
Project Description:
RALS organizes show for the farmers and other related small business persons to display their latest technology equipment for betterment in the field of agriculture and crop production. The show has different types of stalls and other facilities for which many volunteers …
Read
More

Next

Need an essay written specifically to meet your requirements?

Choose skilled experts on your subject and get an original paper within your deadline

156 experts online

Your time is important. Let us write you an essay from scratch

Tips and Tricks from our Blog