ISY2004 Information Systems Project Management

0 Download13 Pages / 3,242 Words

Course Code: ISY2004
University: Australian Institute Of Higher Education

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Question:
The project’s objective is to achieve higher customer service rates and the subsequent benefits from such, as increased retention from customers, higher customer conversion rates and improved internal process, all of which through the implementation of a new Customer Relationship Management (CRM) system, and its integrations with current system, processes and procedures. In order to accomplish that, the following items must be analysed:
Gantt Chart
Work breakdown Structure (WBS)
Critical Path and network diagram
Resource table
Budget
RACI table
Risk management
Answer:
Overview of the Project

The paper mainly focusses on the big data use within the organization in order to handle the operations of the business.  The organization mainly utilizes big data analytics package that generally include various types of programs in order to understand the requirements of marketing, for identifying customers and for improving the service delivery  to the various customers of the organization. It is found that the main goal of the organization is to gain agreement with the various stakeholders on utilizing big data with the various operations that is done in IoT sensors with the help of both prescriptive and predictive maintenance.
1. Gantt chart
 
Figure 1: Gantt chart
2. Network Diagram
A network diagram is one of the visual representation of network architecture that generally helps in mapping out the entire structure of the network with the help of variety of different types of symbols as well as line connections. It is considered as one of the ideal way of sharing layout of the entire network as the visual representation is quite easier for the users to understand when it is generally connected.
 
Figure 2: Network Diagram
3. Six milestones
The milestones of the project are listed in the table below:

Milestone

Completion date

      Milestone 1: Completion of project initiation phase

Fri 01-06-18

      Milestone 2: Completion of planning phase

Wed 04-07-18

      Milestone 3: Completion of execution phase

Thu 20-09-18

      Milestone 4:Completion of testing phase

Thu 04-10-18

      Milestone 5:Completion of closure phase

Fri 12-10-18

4. Resource Table
The project of big data analytics package will generally be limited to demonstrate the entire human resource that is generally applied to the project with the various respective costs.

Resource Name

Type

Material Label

Initials

Group

Max. Units

Std. Rate

Project planner

Work

 

P

 

100%

$ 40.00/hr.

Project manager

Work

 

P

 

100%

$ 35.00/hr.

Financial manager

Work

 

F

 

100%

$ 30.00/hr.

Human resource manager

Work

 

H

 

100%

$ 30.00/hr.

Risk analyst

Work

 

R

 

100%

$ 35.00/hr.

Application engineer

Work

 

A

 

100%

$ 35.00/hr.

Database administrator

Work

 

D

 

100%

$ 35.00/hr.

IT analyst

Work

 

I

 

100%

$ 35.00/hr.

Technical engineer

Work

 

T

 

100%

$ 35.00/hr.

Tester

Work

 

T

 

100%

$ 30.00/hr.

 

 

 

 

 

 

 

Hardware cost

Material

 

H

 

 

$ 15,000.00

Software cost

Material

 

S

 

 

$ 15,000.00

Network

Material

 

N

 

 

$ 10,000.00

Additional cost

Material

 

A

 

 

$ 10,000.00

The table below reflects the how the human resources are utilized in each of the activities of the project for finishing the project within the expected budget and time.

Task Name

Duration

Start

Finish

Predecessors

Resource Names

Utilization of big data analytics package

110 days

Mon 14-05-18

Fri 12-10-18

 

 

   Initiation phase

15 days

Mon 14-05-18

Fri 01-06-18

 

 

      Developing business case

3 days

Mon 14-05-18

Wed 16-05-18

 

Project planner

      Identifying the need of big data analysis package

4 days

Thu 17-05-18

Tue 22-05-18

2

Project planner

      Undertaking feasibility study’

2 days

Wed 23-05-18

Thu 24-05-18

3

Financial manager, Human resource manager

      Establishing project charter

3 days

Fri 25-05-18

Tue 29-05-18

4

Project manager

      Appointing team members for the project

3 days

Wed 30-05-18

Fri 01-06-18

5

Human resource manager

      Milestone 1: Completion of project initiation phase

0 days

Fri 01-06-18

Fri 01-06-18

6

 

   Planning phase

23 days

Mon 04-06-18

Wed 04-07-18

 

 

      Developing project plan

3 days

Mon 04-06-18

Wed 06-06-18

7

Project manager

      Creating resource plan

4 days

Thu 07-06-18

Tue 12-06-18

9

Human resource manager

      Developing financial plan

3 days

Wed 13-06-18

Fri 15-06-18

10

Financial manager

      Developing quality plan

4 days

Mon 18-06-18

Thu 21-06-18

11

IT analyst

      Creating risk management plan

3 days

Fri 22-06-18

Tue 26-06-18

12

Risk analyst

      Developing acceptance plan

3 days

Wed 27-06-18

Fri 29-06-18

13

Project manager

      Developing communication plan

3 days

Mon 02-07-18

Wed 04-07-18

14

Human resource manager, Project manager

      Milestone 2: Completion of planning phase

0 days

Wed 04-07-18

Wed 04-07-18

15

 

   Implementation phase

56 days

Thu 05-07-18

Thu 20-09-18

 

 

       Gaining executive level sponsorship

6 days

Thu 05-07-18

Thu 12-07-18

16

Technical engineer

      Re-build

7 days

Fri 13-07-18

Mon 23-07-18

18

Application engineer

      Making value to the customer priority

8 days

Tue 24-07-18

Thu 02-08-18

19

Human resource manager

       Data quality

7 days

Fri 03-08-18

Mon 13-08-18

20

IT analyst, Software cost[1]

      Machine learning

6 days

Tue 14-08-18

Tue 21-08-18

21

Application engineer

      High Volume processing

7 days

Wed 22-08-18

Thu 30-08-18

22

Technical engineer

      Linking customer data to company process

7 days

Fri 31-08-18

Mon 10-09-18

23

Database administrator

      Creating repeatable processes and actions paths

8 days

Tue 11-09-18

Thu 20-09-18

24

Application engineer, Hardware cost[1]

      Milestone 3: Completion of execution phase

0 days

Thu 20-09-18

Thu 20-09-18

25

 

   Testing phase

10 days

Fri 21-09-18

Thu 04-10-18

 

 

       White box testing

2 days

Fri 21-09-18

Mon 24-09-18

26

Tester

      Usability testing

3 days

Tue 25-09-18

Thu 27-09-18

28

Tester, Additional cost[1]

      User acceptability testing

2 days

Fri 28-09-18

Mon 01-10-18

29

Tester

      Black box testing

3 days

Tue 02-10-18

Thu 04-10-18

30

Tester

      Milestone 4:Completion of testing phase

0 days

Thu 04-10-18

Thu 04-10-18

31

 

   Closure phase

6 days

Fri 05-10-18

Fri 12-10-18

 

 

       Post-project review

3 days

Fri 05-10-18

Tue 09-10-18

32

Project planner

      Stakeholder sign off

2 days

Wed 10-10-18

Thu 11-10-18

34

Project manager

      Documentation

1 day

Fri 12-10-18

Fri 12-10-18

35

Project manager, Project planner

      Milestone 5:Completion of closure phase

0 days

Fri 12-10-18

Fri 12-10-18

36

 

5. Project budget
It is assumed that the budget that is generally needed in order to finish the project is around $71, 520. The table that is provided below reflects the cost that is associated with each of the activities of the project.

Task Name

Duration

Start

Finish

Predecessors

Resource Names

Cost

Utilization of big data analytics package

110 days

Mon 14-05-18

Fri 12-10-18

 

 

$ 71,520.00

   Initiation phase

15 days

Mon 14-05-18

Fri 01-06-18

 

 

$ 4,760.00

      Developing business case

3 days

Mon 14-05-18

Wed 16-05-18

 

Project planner

$ 960.00

      Identifying the need of big data analysis package

4 days

Thu 17-05-18

Tue 22-05-18

2

Project planner

$ 1,280.00

      Undertaking feasibility study’

2 days

Wed 23-05-18

Thu 24-05-18

3

Financial manager, Human resource manager

$ 960.00

      Establishing project charter

3 days

Fri 25-05-18

Tue 29-05-18

4

Project manager

$ 840.00

      Appointing team members for the project

3 days

Wed 30-05-18

Fri 01-06-18

5

Human resource manager

$ 720.00

      Milestone 1: Completion of project initiation phase

0 days

Fri 01-06-18

Fri 01-06-18

6

 

$ 0.00

   Planning phase

23 days

Mon 04-06-18

Wed 04-07-18

 

 

$ 6,880.00

      Developing project plan

3 days

Mon 04-06-18

Wed 06-06-18

7

Project manager

$ 840.00

      Creating resource plan

4 days

Thu 07-06-18

Tue 12-06-18

9

Human resource manager

$ 960.00

      Developing financial plan

3 days

Wed 13-06-18

Fri 15-06-18

10

Financial manager

$ 720.00

      Developing quality plan

4 days

Mon 18-06-18

Thu 21-06-18

11

IT analyst

$ 1,120.00

      Creating risk management plan

3 days

Fri 22-06-18

Tue 26-06-18

12

Risk analyst

$ 840.00

      Developing acceptance plan

3 days

Wed 27-06-18

Fri 29-06-18

13

Project manager

$ 840.00

      Developing communication plan

3 days

Mon 02-07-18

Wed 04-07-18

14

Human resource manager, Project manager

$ 1,560.00

      Milestone 2: Completion of planning phase

0 days

Wed 04-07-18

Wed 04-07-18

15

 

$ 0.00

   Implementation phase

56 days

Thu 05-07-18

Thu 20-09-18

 

 

$ 45,360.00

       Gaining executive level sponsorship

6 days

Thu 05-07-18

Thu 12-07-18

16

Technical engineer

$ 1,680.00

      Re-build

7 days

Fri 13-07-18

Mon 23-07-18

18

Application engineer

$ 1,960.00

      Making value to the customer priority

8 days

Tue 24-07-18

Thu 02-08-18

19

Human resource manager

$ 1,920.00

       Data quality

7 days

Fri 03-08-18

Mon 13-08-18

20

IT analyst, Software cost[1]

$ 16,960.00

      Machine learning

6 days

Tue 14-08-18

Tue 21-08-18

21

Application engineer

$ 1,680.00

      High Volume processing

7 days

Wed 22-08-18

Thu 30-08-18

22

Technical engineer

$ 1,960.00

      Linking customer data to company process

7 days

Fri 31-08-18

Mon 10-09-18

23

Database administrator

$ 1,960.00

      Creating repeatable processes and actions paths

8 days

Tue 11-09-18

Thu 20-09-18

24

Application engineer, Hardware cost[1]

$ 17,240.00

      Milestone 3: Completion of execution phase

0 days

Thu 20-09-18

Thu 20-09-18

25

 

$ 0.00

   Testing phase

10 days

Fri 21-09-18

Thu 04-10-18

 

 

$ 12,400.00

       White box testing

2 days

Fri 21-09-18

Mon 24-09-18

26

Tester

$ 480.00

      Usability testing

3 days

Tue 25-09-18

Thu 27-09-18

28

Tester, Additional cost[1]

$ 10,720.00

      User acceptability testing

2 days

Fri 28-09-18

Mon 01-10-18

29

Tester

$ 480.00

      Black box testing

3 days

Tue 02-10-18

Thu 04-10-18

30

Tester

$ 720.00

      Milestone 4:Completion of testing phase

0 days

Thu 04-10-18

Thu 04-10-18

31

 

$ 0.00

   Closure phase

6 days

Fri 05-10-18

Fri 12-10-18

 

 

$ 2,120.00

       Post-project review

3 days

Fri 05-10-18

Tue 09-10-18

32

Project planner

$ 960.00

      Stakeholder sign off

2 days

Wed 10-10-18

Thu 11-10-18

34

Project manager

$ 560.00

      Documentation

1 day

Fri 12-10-18

Fri 12-10-18

35

Project manager, Project planner

$ 600.00

      Milestone 5:Completion of closure phase

0 days

Fri 12-10-18

Fri 12-10-18

36

 

$ 0.00

6. RACI table
A responsibility assignment matrix that is known as RACI matrix mainly elaborates the participation by different roles in order to finish the tasks as well as deliverables of the project. It is quite useful in clarifying roles as well as responsibilities in various cross-functional departments of the project and processes. RACI is an acronym that generally includes four key responsibilities, which are:
R- Responsibility
A- Accountable
C- Consulted
I-Informed

 

Project planner

Project manager

Financial manager

Human resource manager

Risk analyst

Application engineer

Database administrator

It analyst

Technical engineer

Tester

Developing business case

R, A

C, I

 

 

 

 

 

 

 

 

Identifying the need of big data analysis package

R, A

C, I

 

 

 

 

 

 

 

 

Undertaking feasibility study’

I

C

R, A

 

 

 

 

 

 

 

Establishing project charter

R,A

I,C

 

 

 

 

 

 

 

 

Developing project plan

R,A

I

 

 

 

 

 

 

 

 

Creating resource plan

C

I

 

R, A

 

 

 

 

 

 

Developing financial plan

C

I

R, A

 

 

 

 

 

 

 

Developing quality plan

I

C

 

 

 

 

 

R, A

 

 

Creating risk management plan

C

I

 

 

R, A

 

 

 

 

 

Developing acceptance plan

R, A

C

 

I

 

 

 

 

 

 

Developing communication plan

R, A

I

 

C

 

 

 

 

 

 

Gaining executive level sponsorship

C

 

 

 

 

I

 

 

R, A

 

Re-build

I

 

 

 

 

R, A

 

 

C

 

Making value to the customer priority

C

I

 

R, A

 

 

 

 

 

 

Data quality

 

 

 

 

C

I

 

R

 

A

Machine learning

 

 

 

 

 

A

C

R

I

 

High Volume processing

 

 

 

 

 

A

C

R

I

 

Linking customer data to company process

 

 

 

 

 

I

R, A

 

C

 

Creating repeatable processes and actions paths

 

 

 

 

 

A

C

R

I

 

White box testing

 

 

 

 

 

I

 

C

 

R, A

Usability testing

 

 

 

 

 

I

 

C

 

R, A

User acceptability testing

 

 

 

 

 

I

 

C

 

R, A

Black box testing

 

 

 

 

 

I

 

C

 

R, A

Post-project review

R, A

I, C

 

 

 

 

 

 

 

 

Stakeholder sign off

R, A

I, C

 

 

 

 

 

 

 

 

Documentation

R, A

I, C

 

 

 

 

 

 

 

 

7. Project Risk

Risk

Description

Impact

Probability

Responsible person

Mitigation strategy

Budget Shortfall
(Negative Risk)

If the project manager are unable to manage the budget of the project effectively then sometimes budget is misused on resources that are generally not required in the project. This generally causes shortage of budget for executing other activities of the project.

Extreme

Very Likely

Financial manager

It is identified that in order to resolve the issues that are related with budget shortfall, it is very much necessary to undertake earned value analysis so that the budget can be tracked for ensuring that the amount that is being invested is proper.

Schedule slippage
(Negative Risk)

If the schedule of the project is not tracked properly then there is high chance of schedule slippage. It is identified that due to schedule slippage, it is quite difficult to finish the project within the expected time and budget.

Extreme

Likely

Project manager

It is quite necessary to track the schedule of the project on a weekly basis in order to ensure that the schedule of the project is on the right track and it will be finished within the expected budget and time.

Inexperienced project manager
(Negative Risk)

If the project managers are not experienced then it will be quite difficult to them to manage all the activities as well as tasks of the project effectively within the assumed time and budget.

Major

Moderate

Human resource manager

It is quite necessary for the human resource manager to hire experienced project manager who have proper skills as well as knowledge related with the project so that the risks as well as challenges that are related with the project can be easily mitigated. In addition to this, proper experience of the project managers are helpful in managing work effectively for fining the project within the expected budget and time.

Scope creep
(Positive Risk)

If scope creep occur within the project then it will generally enhance both time and budget that is needed for finishing the project.

Moderate

Moderate

Project manager

It is identified that due to scope creep, the changes that are required for enhancing the quality of the project are done which generally create positive impact on the usability of the system that is related big data analytics package.

Improper management
(Negative Risk)

If the project managers are unable to manage the project then it will generally increases the time that is needed for finishing the project.

Moderate

Likely

Human resource manager

In order to resolve this issue, it is very much necessary to utilize proper management strategies within the project so that with the help of the strategies the project managers will be able to manage the project effectively that will be helpful in finishing the project on time.

Technical issues
(Negative Risk)

If the data of the customers are not properly linked due to some technical issue then there is high chance of data loss.

Moderate

Very likely

Technical engineer

In order to resolve this issue, it is very much necessary to check the package that is utilized so that the chances of technical risk occurrence can be minimized to some extent.

8. Impact/Probability Matrix
Probability and impact matrix utilizes combination of probability as well as impact scores of various risks and generally ranks them in order to handle the risks. It is identified that probability and impact matrix generally helps in determining which risks generally requires detailed risk response plans. In order to remain aware of the risks that may create negative impact on the project it us very much necessary to analyze the risks with the help of impact/probability matrix. It is considered as one of the useful framework that generally helps in deciding which risk can create much negative impact and which of them generally needs attention. It is found that in this project impact/probability matrix is utilized in order to identify the risks and challenges that are associated with the project, which generally requires attention for successfully mitigating them.

 

Low

Minor

Moderate

Major

Extreme

Rare

 

 

 

 

 

Unlikely

 

 

 

 

 

Moderate

 

 

Scope creep

Inexperienced project managers

 

Likely

 

 

Improper management

 

Schedule slippage

Very Likely

 

 

Technical issues

 

Budget shiortfall

Bibliography
Badewi, A., 2016. The impact of project management (PM) and benefits management (BM) practices on project success: Towards developing a project benefits governance framework. International Journal of Project Management, 34(4), pp.761-778.
Calvo-Mora, A., Navarro-García, A. and Periañez-Cristobal, R., 2015. Project to improve knowledge management and key business results through the EFQM excellence model. International Journal of Project Management, 33(8), pp.1638-1651.
Chih, Y.Y. and Zwikael, O., 2015. Project benefit management: A conceptual framework of target benefit formulation. International Journal of Project Management, 33(2), pp.352-362.
Conforto, E.C., Salum, F., Amaral, D.C., da Silva, S.L. and de Almeida, L.F.M., 2014. Can agile project management be adopted by industries other than software development?. Project Management Journal, 45(3), pp.21-34.
Costantino, F., Di Gravio, G. and Nonino, F., 2015. Project selection in project portfolio management: An artificial neural network model based on critical success factors. International Journal of Project Management, 33(8), pp.1744-1754.
Heldman, K., 2018. PMP: project management professional exam study guide. John Wiley & Sons.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and project success in different project governance contexts. International Journal of Project Management, 33(6), pp.1377-1392.
Kucharska, W. and Kowalczyk, R., 2016. Trust, Collaborative Culture and Tacit Knowledge Sharing in Project Management–a Relationship Model.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., 2014. Project risk management methodology for small firms. International journal of project management, 32(2), pp.327-340.
Marcelino-Sádaba, S., González-Jaen, L.F. and Pérez-Ezcurdia, A., 2015. Using project management as a way to sustainability. From a comprehensive review to a framework definition. Journal of cleaner production, 99, pp.1-16.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), pp.202-217.
Riol, H. and Thuillier, D., 2015. Project management for academic research projects: balancing structure and flexibility. International Journal of Project Organisation and Management, 7(3), pp.251-269.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp.278-290.

Free Membership to World’s Largest Sample Bank

To View this & another 50000+ free samples. Please put
your valid email id.

E-mail

Yes, alert me for offers and important updates

Submit 

Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

UploadUnique Document

DocumentUnder Evaluation

Get Moneyinto Your Wallet

Total 13 pages

PAY 8 USD TO DOWNLOAD

*The content must not be available online or in our existing Database to qualify as
unique.

Cite This Work
To export a reference to this article please select a referencing stye below:

APA
MLA
Harvard
OSCOLA
Vancouver

My Assignment Help. (2020). ISY2004 Information Systems Project Management. Retrieved from https://myassignmenthelp.com/free-samples/isy2004-information-systems-project-management/the-project-of-big-data-analytics-package.html.

“ISY2004 Information Systems Project Management.” My Assignment Help, 2020, https://myassignmenthelp.com/free-samples/isy2004-information-systems-project-management/the-project-of-big-data-analytics-package.html.

My Assignment Help (2020) ISY2004 Information Systems Project Management [Online]. Available from: https://myassignmenthelp.com/free-samples/isy2004-information-systems-project-management/the-project-of-big-data-analytics-package.html[Accessed 19 December 2021].

My Assignment Help. ‘ISY2004 Information Systems Project Management’ (My Assignment Help, 2020) accessed 19 December 2021.

My Assignment Help. ISY2004 Information Systems Project Management [Internet]. My Assignment Help. 2020 [cited 19 December 2021]. Available from: https://myassignmenthelp.com/free-samples/isy2004-information-systems-project-management/the-project-of-big-data-analytics-package.html.

×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}

×

Thank you for your interest
The respective sample has been mail to your register email id

×

CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.

Account created successfully!
We have sent login details on your registered email.

User:

Password:

We have brought a unique essay typer that can help you get tool that can help you get urgent essay help in minutes. Now essays with tight deadlines would not be a problem. Our essay typer tool resources information from millions of pages and provides you help with essays on practically any essay topic, or any subjects. Even the referencing is done aptly. You just need to enter the topic in the text box of our essay typer and get an instant essays just by randmly pressing any button on the keyboard. Use the tool now.

Latest Project Management Samples

div#loaddata .card img {max-width: 100%;
}

SBM 1201 Project Scope, Time And Cost Management
Download :
0 | Pages :
12

Course Code: SBM1201
University: Asia Pacific International College

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
This project plan deals with the development of a fuel-efficient HHO Generator. The HHO fuel cells may appear to provide high fuel efficiency to the users. Nevertheless, there are a few confinements and focuses to be seen, as given beneath. This is to clear up that there is NO 100% substitution of petroleum derivative by including HHO cell. HHO gas is otherwise called Brown Gas, yet this is to illuminate that HHO gas is n…
Read
More
Tags:
Australia Footscray Management organisational behviour University of New South Wales Masters in Business Administration 

HS2061 Information Systems Project Management
Download :
0 | Pages :
9

Course Code: HS2061
University: Holmes Institute

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Case Overview:
The project owner of the Signed, sealed, delivered courier service is facing the problems of managing order of couriers in the synchronised manner. The project manager is incapable of managing central warehouse for the dispatching of products. The important information can be lost with the passage of time. The inventory management of the warehouse is the major concern for the owner of the company. He is looking forward …
Read
More

OPS 935 Project Management
Download :
0 | Pages :
11

Course Code: OPS935
University: University Of Wollongong

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
This essay explores the impacts of digital technologies on project management. It explores how adoption of digital technologies by companies for managing their project have affected their, project managers, human resource, business processes, timelines, deliverables, and practices  of risk management, people management and quality management.
Impact of Digital technologies on Project Management Practices
Digital te…
Read
More
Tags:
Australia Saint Kilda Management International Management University of New South Wales Masters in Business Administration 

ITC505 ICT Project Management
Download :
0 | Pages :
10

Course Code: ITC505
University: Charles Sturt University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers
Case Study- Social Media Research Center
Task-1: Project Charter
Project Objectives
The main objective of the project is to develop a web-based system within the organization “Social Media research Center”. It is analyzed that the Social Media research center wants to develop the web based system in order to connect people with the organization for promoting its research center. The web-based system that is developed conta…
Read
More
Tags:
Australia Alfredton Management IT Network Security  University of New South Wales Masters in Business Administration 

ITC505 ICT Project Management
Download :
0 | Pages :
7

Course Code: ITC505
University: Charles Sturt University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers
Part One- Project Name / Team / Description
Project Name:
RALS Solution
Team Name:
Consultants for RALS
Project Description:
RALS organizes show for the farmers and other related small business persons to display their latest technology equipment for betterment in the field of agriculture and crop production. The show has different types of stalls and other facilities for which many volunteers …
Read
More

Next

Need an essay written specifically to meet your requirements?

Choose skilled experts on your subject and get an original paper within your deadline

156 experts online

Your time is important. Let us write you an essay from scratch

Tips and Tricks from our Blog